Cathodic protection
Cathodic protection
Keeping CP systems in compliance and documented for your integrity records.
- Annual CP surveys
- Bi-monthly rectifier & critical bond inspections
- CP inspection and troubleshooting
- Interference testing
Works to 49 CFR 192 Subpart I · 49 CFR 195 Subpart H · NACE SP0169
Surveys
Integrity surveys
Indirect inspection data you can feed straight into your integrity program.
- Close-interval surveys (CIS)
- ACVG and DCVG coating surveys
- Pipeline current mapping (PCM)
- Depth of cover surveys
- ECDA indirect inspections
Works to NACE SP0207 (CIS & DCVG) · NACE SP0502 (ECDA)
Hydro-vac & excavation
Test stations
Hydro-vac excavation for safe, quick test station installs on live lines.
- Test station installation
- Potholing and line locating support
- Integrity digs and bell holes
Works to 49 CFR 192.469 & 192.471 (test leads) · 192.459 (exposed pipe exams)
Construction
CP construction
Installing and upgrading the systems that protect your pipe.
- Groundbed installation
- AC mitigation
Works to NACE SP0169 (CP design criteria) · NACE SP21424 (AC corrosion)
Coatings
Painting & coating
Surface prep and coating application above and below grade.
- Above-ground painting and coating
- Below-ground coating repair
Works to SSPC-SP 10 / NACE No. 2 · NACE SP0188 (holiday testing)
Field services
Repair & roustabout
General field labor and repair support for your facilities and right-of-way.
- Field repair
- Roustabout work